PCL Construction, on behalf of the City of Swift Current, will be performing a rehabilitation on the South Railway Street Bridge.

This will include removing and replacing the asphalt surface, installation of a waterproofing membrane, replacing expansion joints, and performing concrete repairs on the existing abutments, barriers, piers, and deck.

The work is set to begin on Monday, September 11. The bridge will be closed to pedestrian and vehicle traffic at this time.

We are anticipating the closure will last approximately one month. Detour signs will be in place.

The City would like to thank residents and motorists for their patience during this project.