2006-07-15 Author: swiftcurrentonline.com |
Some railway tracks in Swift Current are getting a face lift.
The crossing at Highway # 4 between south railway street east and chaplin street east is being worked on by the CPR starting on Sunday at 10 P.M., and ending Wednesday at 6:00 P.M. |